Product Details

Place of Origin: Guangdong, China

Brand Name: ECER

Certification: ISO 9001:2015, CE

Model Number: RK-130LD

Payment & Shipping Terms

Minimum Order Quantity: 1 Set

Price: USD 175000-390000 / Set

Packaging Details: Standard export packing with steel frame reinforcement, waterproof membrane and fumigation-free plywood case, roller and drive parts in separate cushioned crates

Delivery Time: 45 days after deposit

Payment Terms: T/T,L/C,Western Union

Supply Ability: 45 days

Get Best Price
Highlight:

Roller kiln 45-day delivery

,

Roller kiln fast recipe changeover

,

Roller kiln firing line

Delivery Time:
45 Days After Deposit
Module Length:
4.2 M Per Section
Recipe Changeover:
Under 4 Hours
Preheating Ramp:
Programmed Auto Ramp
Kiln Length:
130 M
Firing Temperature:
1210 C
Fuel Type:
Natural Gas / LPG
Control System:
PLC + Recipe Library
Warranty:
24 Months
Delivery Time:
45 Days After Deposit
Module Length:
4.2 M Per Section
Recipe Changeover:
Under 4 Hours
Preheating Ramp:
Programmed Auto Ramp
Kiln Length:
130 M
Firing Temperature:
1210 C
Fuel Type:
Natural Gas / LPG
Control System:
PLC + Recipe Library
Warranty:
24 Months
Roller Kiln Shortened Production Lead Time 45 Day Delivery Fast Recipe Changeover Firing Line

Short Lead Time Modular Roller Kiln

Overview

Long build schedules cost orders. This roller kiln uses a modular 4.2m section design that is pre assembled and tested before shipment, shortening production lead time to 45 days from deposit and cutting site erection work. A stored recipe library with automatic ramp control allows fast recipe changeover in under four hours, so one line can serve several tile formats and colours without long changeover downtime.

Key Features

  • Shortened production lead time of 45 days from deposit
  • Modular 4.2m sections pre assembled and tested before shipment
  • Fast recipe changeover in under four hours from the recipe library
  • Automatic preheating ramp protecting rollers during start up
  • Reduced site erection work and commissioning time

Technical Specifications

Delivery45 days
Module4.2 m section
Changeoverunder 4 h
Kiln Length130 m
Max Temperature1210 C
ControlPLC recipe library

Applications

  • Plants with tight project schedules
  • Multi product tile factories
  • Replacement of aging kiln lines
  • Overseas projects with short installation windows

Service & Support

Supply includes kiln layout engineering, roller installation supervision, firing curve commissioning, " "operator training and a two year spare roller package. Remote diagnostics and on site service are " "available for the full kiln life.

Contact

Send your tile size, thickness, target output and fuel plan, and our engineers will return a matched " "roller kiln layout, firing curve and quotation.